A Varied Body of Work
From healthcare to K-12 education, industrial to government, we’ve done it all.
Water Utility Company
Installed chemical feed piping at Water Treatment facility.
Kerry Vinegar
Installation of 6 new circulation pumps including welding 3” Schedule 40 Stainless Steel piping and re-piping 2” Schedule 80 PVC to connect to existing discharge piping.
Jersey Community School District
Installed boiler and boiler piping at elementary school during building renovation.
Jersey Community School District
Installed Chiller and piping at Elementary School during building renovation.
City of Alton, IL
Installed underground piping and pumps for fountain.
City of Jerseyville, IL
Installation of radiant tube heaters and gas line inside of Fire Department. In addition, piping was installed to provide pressurized air reels throughout the shop area.
City of Jerseyville, IL
Branch box for VRF heads at City Hall.
City of Jerseyville, IL
Installed a VRF system at City Hall.
Water Utility Company
Potholed existing services along a roadway to determine where galvanized and lead piping was present in a suspected area for client. Once lead was determined, the homeowner was contacted to schedule a water service line replacement to remove lead piping from the clients’ water main to their customers’ home.
Water Utility Company
Installed linestop with 36” bypass.
Water Utility Company
Performed 54” linestop.
Water Utility Company
24” Flanged Piping install with actuated valves at Water Treatment Facility.
Insights & Thought Leadership
As a Crete United company, we’re part of a rich network that shares best practices, resources and innovations. For the latest on how we’re thinking about the role of energy efficiency and the future of the built environment, explore Crete United’s resources.